Turnkey Project
“EV” Fender assembly
cell full integration
• 2x Robots
• Design & Process Simulation
• Build & Install
• PLC
• Robotics
Facility:
Magna SFT
Magna SFT
City:
Hermosillo, Sonora
Hermosillo, Sonora
Year:
2018
2018
Install of complete Weld
(Body) Shop including
main feeds
Full install weld shop at
main body (52, 750 sq ft)
• 4x Mezzanine
• 40x Robots
• 18x WPP
• 22x CDP
Facility:
Toyota Manufacturing of Mexico
Toyota Manufacturing of Mexico
City:
Apaseo el Grande, Guanajuato
Apaseo el Grande, Guanajuato
Year:
2018 – 2019 – 6 months (current)
2018 – 2019 – 6 months (current)
Install of complete Weld
(Body) Shop including
main feeds
Full install weld shop at
shell body (43,000 sq ft)
• 6x Hem Presses
• 24x Robots
• 12x WPP
• 15x CDP
Facility:
Toyota Manufacturing of Mexico
Toyota Manufacturing of Mexico
City:
Apaseo el Grande, Guanajuato
Apaseo el Grande, Guanajuato
Year:
2018 – 2019 – 6 months (current)
2018 – 2019 – 6 months (current)
Design & Automation
“Ford Motor Company
Automatic Fixture to install Rear Suspension
Goal was to change from manual operation to be
fully automated.
Battery load and Unload cell
Goal was to change from manual operation to be
fully automated.